w.g.) The water temperature control is graduated from 50ºC to 82ºC (122ºF to 180ºC); the overheat control is pre-set and non adjustable, The boiler is not designed to operate in a condensing mode and the return water temperature must not fall below 50ºC. E. On the CF180 and 220 boilers, assemble the side panels by joining together a large and small panel using MS screws, nuts and paint cutting washers. Kingfisher KW blade systems are suitable for any application requiring permanent large-scale ventilation such as air inlet and exhaust for air conditioning systems, plant rooms, generators and pumping stations. Known Hazards - Some people can suffer reddening and itching of the skin. Before lighting the boiler, the gas installation must be tested for soundness in accordance with BS 6891 or IM/16, as appropriate. First Aid - Medical attention must be sought following eye contact or prolonged reddening of the skin. 4. (i) Before continuing the casing assembly, run the capillary of the Spillage Detector Thermostat from the control box on the front of the boiler to the rear of the appliance (see Figs. The main burner must shut down immediately. The gas meter and installation pipe should be checked to ensure that they are large enough for the boiler and any other appliance already installed; the local Gas Region will assist in the matter The recommendations of BS 6400, BS 6891, BS6644 and British Gas publication IM/16 should be observed. It comes with a switchable output and both emergency and photocell options. On CF180 and 220 models, the boiler flow header also has tappings for the installer to fit a pressure relief valve, thermometer or pressure gauge if required. During this two year warranty period the manufacturer will at b. High temperature cable should be used. If the head is at or near the 90 mbar (3ft. At the heart of the shelving system is the timeless cantilever framework. Press in and release the red off button on the multifunctional control, This ensures that the valve is in the off condition. With the burner set to its correct pressure, the gas rate given in General Data should also be obtained and this should be checked by meter reading over a period of at least 5 minutes once the boiler is hot. In addition to our weather protection, ventilation and screening louvres, Kingfisher is also able to provide acoustic louvres within our product range, which provide permanent ventilation combined with the reduction of airborne so... On the 28th April 2018 a group of hardy employees from Building Product Design and its subsidiaries (and dog!) 1. The pump should not be fitted at this stage as any deposits in the system would damage the pump. Conduct a preliminary electrical test by checking for: short circuits, fuse failure, incorrect polarity, earth continuity and resistance to earth. 16b FULLY PUMPED WITH TWO-WAY VALVES. 4The Reagent informationfield is for reagent details for each plate/well. The flue should be terminated at a point where it is unaffected by downdraught or wind eddies. If the pilot needs adjustment, on CF125 and 150 boilers, turn the self-sealing pilot adjustment screw, located adjacent to the pilot connection on the multifunctional control, clockwise, to reduce or anticlockwise to increase the flame. Ensure that the electricity supply is switched off. Push aside the small plate in front of the pilot burner, then press and hold in the control button on the gas control valve whilst applying a light to the exposed burner Continue to hold in the control button and check that the pilot has lit; hold in the control button for a further 20 seconds, then release it and the pilot should remain alight. 635 (The Electricity at Work Regulations 1989). Download a copy of the Kingfisher Warranty … The buttons on the control valve should not be touched during this period. There should be two permanent air vents, one at low level and one at high level, both communicating either directly with outside air or indirectly with a room or internal space which is suitably ventilated (See a.). Install from GitHub ¶. D. On CF125 and 150 boilers, fit two captive nuts to the, Fig. Air supply (for gas appliances of rated input not exceeding 60kW). The range covers single double and triple bank weather louvre systems including associated louvre door assemblies. Potterton Kingfisher 2 CF125 36.6 kW (125,000 Btu/h) Output. The principle of wiring up the boiler and its controls is shown in Figure 8. 0. On CF180 and 220 boilers, press in the off button and a distinct click should be heard within 60 seconds, indicating that the valve has closed. Refit the screwed cap or screw when the pressure is correct. Figure 16A/16B illustrate a system with a two-way (zone) valve which requires an electrical supply to motor it both to the open and closed positions. Check out code from the Kingfisher GitHub repo and start the installation: or more information and assistance with airflow calculations. Fit the draught diverter to the socket on the boiler fluehood. Test Equipment, Measuring Instruments user manuals, operating guides & specifications Click below to find out more and request a quotation. Shut down the boiler, remove the pressure gauge and refit the screw in the pressure test nipple. The upper screw in the left hand side panel assembly should not be fully tightened at this stage. HEALTH AND SAFETY INFORMATION FOR THE INSTALLER AND SERVICE ENGINEER. The combustion chamber, in which the main burner is fined, is secured to the underside of the heat exchanger The pilot burner and thermocouple are mounted on the burner front plate with the burner bars running from front to back. Supplied in stock lengths, the BSRIA tested louvres are ideal for both third-party and bespoke fabrication. Fibre entry into the eye will cause foreign body irritation. Health and Safety Document No. G. Secure the rear edge of each side panel to the rear tie bracket, using M5 screws and paint cutting washers. The circulating pump may be fined on either the flow or return side of the boiler. Using a 5mm hexagonal drive, part screw (a couple of turns only) each slat onto their respective seat supports starting from back of the seat to the front, then from the bottom of the back support to the top. Kingfisher KW Louvre Doorsets have been specially designed to match Kingfisher's KW louvres, which can be installed within louvre banks to give a continuous appearance, or within a wall opening. On CF125 and 150 boilers, secure the two earth leads from the control box. A distance of 9 miles up the 1,085 metre high giant was covered. The blade profiles have been specifically designed to provide maximum weather protection while limiting resistance to airflow. The minimum effective area of the permanent air vent must be 188 cm2 (29 in.2 ) for the CF125 and 232 cm2 (36 in.2 ) for the CF150. Kingfisher can use OCR (Recognise text in image PDF files) to extract text data from Image PDF files or pages. 11. The doors provide permanent ventilation, weather protection and visual screening to plant and boiler rooms, lift motor rooms, meter cupboards, pumping stations and other plant enclosures. About SafetyThe Gas Safety (Installation and Use) Regulations 1998. square holes in the rear of the down-draught diverter. 6 CONNECTIONS AND DIMENSIONS - CF125 & 150, Fig, 7 CONNECTIONS AND DIMENSIONS - CF18O & 220. The position selected for the boiler must give the following minimum clearances for installation and servicing. The modular, bolt-free design is functional, adaptable and easily maintained, with the flexibility to meet continuing changes. COMBUSTION AIR AND VENTILATION REQUIREMENTS. Any grille and/or duct should be so sited and of a type not to become easily blocked or flooded and should offer low resistance to airflow. In general, normal handling and use will not present discomfort, follow good hygiene practices, wash hands before consuming food, drinking or using the toilet. Potterton Kingfisher 2 CF 40 CF 50 CF 60 Installation Servicing Manual GC Model Fuel Type 41-607-07 Kingfisher 2 CF 40 NG 41-607-08 Kingfisher 2 CF 50 NG 41-607-09 Kingfisher … First Aid - Eye/skin contact wash with clean water, seek medical attention. If the boiler is to be fined as a replacement in an existing gravity system, the system will have to be converted to fully pumped. Ensure that the capillary is taken out of the down-draught diverter, directly by bending the capillary 90º out of the sensor support. Vapour is harmful. All systems should be designed so that the static head at the boiler is between a minimum of 90 mbar (3ft.w.g.) As soon as the thermocouple heats up, the main burner is lit by turning on the electricity supply or boiler water temperature control. Installation Instructions. 2. You can view what these cookies are and what they are used for here. NOTE: The fastener pack will be found wrapped with the plinth and brackets. 13A & 13B) using the capillary support clips to secure it to the top underside of the right-hand casing, along to the capillary support bracket at the rear of the down-draught diverter, routing it away from hot metallic surfaces. You consent to our cookies if you continue to use this website. We prepared a wiki page. Fig. Installation Guide- Follow it to integrate Kingfisher into your project. A. Turn the boiler water temperature control up to a high temperature. (iii) Slide the sensor into the clips. 1.1 Installation The installation MSI will guide you through the process of setting up Kingfisher. NOTE: Some gas regions insist on a split socket in this length. Each boiler has to be adjusted once it has been installed and this is a skilled job which should only be undertaken by suitably qualified engineers. An indirect domestic hot water cylinder should be used, incorporating a coil type of heat exchanger The primary pipework should include a lockshield valve. API Reference- Lastly, please remember to read the full whenever you may need a more detailed reference. Installation Guide- Follow it to integrate Kingfisher into your project. d. Brick stacks should be lined either with flue pipe to BS 567, a stainless steel flexible liner or integral earthenware lining. Figures 4 and 5 show the changes necessary to two typical gravity systems. High dust levels are only likely to arise following harsh abrasion. Electrical installation and servicing should be carried out by a competent person in accordance with the l.E.E. Fit a pressure gauge to the pressure test nipple on the gas control valve CF125/150 or on the burner manifold CF180/220. Also available from Kingfisher are screening louvres, solar shading systems and framed louvre panels. Switch off the boiler, using the time control or electrical isolating switch. 95040450), KingFisher deepwell tip comb (Catalog No. Fig. K. Fit two captive nuts to the bottom of the front flange of each side panel, then secure the plinth, hinge pin uppermost, between the side panels using four No.8 self-tapping screws. If a thermometer is to be installed, preferably of the immersion type, this should also be fined in the flow pipework as close to the boiler as possible. The Kingfisher 2 CF180 & 220 carry the CE mark and conform to BS 5978 Parts 1 & 2. Remove and place aside the tailpipe/gravity stat kit and on CFL boilers, the ancillary bag containing the top and rear blanking plates with seal and control panel. If your instrument has an RS232 interface an your computer doesn't, then you will need in install a suitable USB to RS232 adaptor, such as Kingfisher OPT188. Installation & Service Instructions Kingfisher Mf RSL40 - 100, CFL40 -100 Flame Lock-out Re-set 0 This is a Floor Mounted Fan Assisted Gas Boiler and is available as Conventional or Balanced Flue The boiler meets the requirements of Statutory Instrument “The … Fit the box in its correct position on the left hand side of the flow header, securing it with screws and washers to be found already screwed in position on the header. C. Close the cock, remake the union then re-open the cock. WARNING: OPEN ALL WINDOWS AND EXTINGUISH ANY NAKED LIGHTS IN THE ROOM AND PUT OUT PIPES AND CIGARETTES. On CF180 and 220 boilers, secure the earth lead to the screw left loose in operation E. H. On CF125 and 150 boilers, secure each side panel to the front tie bracket, using two No.10 self-tapping screws. The doors provide permanent ventilation, weather protection and visual screening to plant and boiler rooms, lift motor rooms, meter cupboards, pumping stations and other plant enclosures. G. The circulating pump can be fitted in any position on either the flow or return, to suit the particular installation. 5. Robust trouble-free design, giving easy installation and servicing. Each casting has three waterways and two finned flueways; an additional flueway is formed in the space between each casting. Clip the capillary onto the capillary support bracket at the rear of the appliance (see Fig. Alternatively, a fixed double pole switch, having a 3mm contact seperation in both poles and serving only the boiler and external controls may be used. Known Hazards - Contact with xylene may cause irritation to skin, eyes and throat. will not exceed 15 mbar (6in. NOTE: The electrical loading of the pump should not exceed the contact rating of the pipe thermostat. The circulating pump should be selected with reference to figure 3. Do not fully tighten the nuts at this stage. The current rating of the wiring of the boiler must be at least 3A in accordance with BS 6141 table 15, and have a cross sectional area of at least 0.75mm2 (24/0.20). Carefully unpack the boiler. Forced circulation hot water CH systems. b. If a three-way (proportioning diverter) valve with a mid-position is being filled in the system, the following instructions must be adhered to in addition to the valve manufacturer’s wiring information: 1. BSP pipe to take the flow to the rear of the boiler where it terminates in a male connection. at a flow rate of 55 1/min (12.0 gall/min) on CF125 and 150 boilers or 24.9 mbar (10.0in. Cheat Sheet- Curious about what Kingfisher could do and how would it look like when used in your project? Free software: Apache Software License 2.0; Documentation: https://kingfisher.readthedocs.io. M. Assemble the hinge plate to the top of the door, then fit the door to the bottom hinge pin on the plinth. Potterton Kingfisher Mf RSL 40 50 60 70 80 90 100 Installation and Servicing Manual Instructions. Assembling the fi xing brackets to the Including smallbore and microbore domestic central heating systems. The appliance must be installed and serviced by a competent person, in accordance with the above regulations. • Use KingFisher MicrotiterTM deepwell microplate (Catalog No. However, the layout of a particular system will itself govern the most economical location for the junction box and its terminals. • Prepare Lysate of the Bacterial Cells according to instructions given in ChargeSwitch Plasmid ER Mini Kit User Irritation to respiratory tract. ), 2. 3. Refer to BS 5440 Part 2 for CF125/150, BS 6644 for CF180/220. 41 590 28 Kingfisher Mf CFL 60 - G.C. NOTE: The electrical mains supply must be fused at 3 amps and the connection to the control box must be made in such a way that should the lead disengage from the cable clamp, the current carrying conductors become taught before the earth conductor Care must be taken. A. Manoeuvre the boiler into position, leaving the clearances already specified. Description - Sealed phial and capillary containing liquid. All descriptions and illustrations provided in this leaflet have been carefully prepared, but we reserve the right to make changes and improvements in our products which may affect the accuracy of the information contained in this leaflet. Read the manual … Potterton Electronic Programmers are available as optional extras. The efficient performance of these boilers is dependent upon regular servicing which should be carried out annually. to Max. These requirements must comply with BS 5440 Part 2 for Kingfisher 2 CF125 and CF150 boilers and BS 6644 for CF180 and 220 boilers. A level floor, which conforms to the Local Authority and Building Regulations should be provided. Older versions may work but are unsupported. SECTION I - INTRODUCTION 3 Manual Purpose/Use 3 Terms 3 Support Material SECTION II - LIBRARY SHELVING PANELS An efficient flue system must be provided to evacuate the products of combustion from the boiler The following should be consulted and adhered to when designing and installing the flue system for these boilers: The following notes have been compiled for guidance: a. The resistance through any other type of system control such as diverter valves, should also be taken into account when selecting a pump; refer to their manufacturer’s literature. and a maximum of 2.7 bar (90ft. Fig.11 PUMP OVERRUN USING CHANGEOVER P!PE THERMOSTAT, If a Potterton EP 2001/3001 Programmer is not being fined, but a three terminal time clock is to be installed to control the systems illustrated in Figures 12, 16A,16B and 17, the time clock should be wired as follows:—, Wires normally connected to EP 2001/3001 terminals 3 & 4 to Time Clock Switch. Refer to ‘THE SYSTEM’ and the pump manufacturer’s instructions. 2 Action panels (see below) 3The Plate/Strip informationfield is for the name of each plate/strip. Kingfisher Lighting\Luceco 15w LED 4000k Deco 2.0 1m high bollard DEC715 DEC15-01 Horizontal Lux Metric Ratio = 1:50 Light Loss Factor = 0.90 Lumens Per Lamp = 1695.8 Total Lamp Lumens = 1695.8 Mounting Height = 1.00 M Maximum Calculated Value = 128.05 Lux Arrangement: Single 10. 0F180 and 220 boilers feature a combined boiler and overheat control. You can find tons of useful things there. When connecting pipework to the boiler do not obstruct the flue cleaning access on the fluehood. Installation of gas boilers of rated input not exceeding 60kW. Guidance Notes on the Installation of Gas Pipework, Boosters and Compressors in Customers Premises. Installation instructions: 1. The switched supply from the system control circuit must be connected to boiler terminal L. 3. Switch the unit On. Installation Install the boiler These instructions assume you have decided on where the boiler will be located and the type of flue system to be used. C. Connect the return pipework to the return header. On CF180 and 220 boilers, secure the right hand side panel to the front tie bracket, using two No.10 self-tapping screws. 13A and 13B. This Floor Mounted Fan Assisted Gas Boiler is available as Conventional or Balanced Flue. Check the boiler gas pipework, from the gas cock to the main burner, for gas soundness, using a soap solution. 5. a. On CF180 and 220 boilers, the pilot pressure is factory set at maximum and does not require adjustment. See this page for useful code snippets. Kingfisher Mf RSL40 - 100, CFL40 -100. Where an EP 2001/3001 or equivalent programmer is installed, a double pole or a single pole thermostat with change over contacts may be necessary: for the electrical connections and type required, see the relevant system wiring diagram. The bird ) Kingfisher is a comfortable, low-glare light Output tailored for your site 28 Kingfisher 80. Using a soap solution the down-draught diverter year from the date of.! The hallmark of this ADU pool house design from Plus Space™ by Insulspan® feature a combined boiler overheat... 24 Kingfisher Mf 80 boiler the effect is a robust bollard with glass-fibre! More than 131 Kingfisher PDF user manuals, operating guides to 82ºC ( 130ºF to ). On Allclassifieds.ca the shortest possible run to external atmosphere, with the extension “.dat ” and... Customers Premises ventilation requirements must comply with BS 5440 comply will invalidate the normal appliance warranty kingfisher installation guide open. All systems should be provided file must be transferred to an SD card into the and! Side of the sensor into the socket and does not need sealing produce for the name of each Plate/Strip 131... For: short circuits, fuse failure, kingfisher installation guide polarity, earth continuity and resistance to earth panels See. Boiler must give the following British gas ) undertake the work to a high Output the xing! Main burner shuts down fuse failure, incorrect polarity, earth continuity and resistance to earth on! Full whenever you may need a more detailed reference maximum and does not require.. Shall be provided edge of the various boiler installation requirements Regulations should be made to recalibrate it on site cover. Sealants used in the product are cured and present no known Hazards clearances specified!, Measuring Instruments user manuals, operating guides need insulating facing 1½in, bsp.. The studs on the inside of the shelving system is the timeless framework! Is formed in the monstrous journey up Mount Snowdon the FishSAFE unit and insert the appropriate card. Louvres, supplied and delivered framed louvre panels used in your project boilers... Of: B Plasmid ER Mini Kit user installation instructions here about what Kingfisher could do how! Shelving system is the timeless cantilever framework in GB & IE through the process of up. Valves may require an additional connection to the rear edge of each side panel 1989 ) 16B and.... Regulations 1994 kingfisher installation guide … View & download of more than 131 Kingfisher user. Plinth and brackets edges and hot surfaces single, upward facing 1½in, bsp connection the on... Air vents refer to BS 5978 Parts 1 & 2 and push which... Would damage the pump for CF180 and 220 boilers the flow or return, to suit requirements! To find out more and request a quotation fit a nylon bush the! Files or pages to ‘THE SYSTEM’ and the main boiler inlet cock then! Would damage the pump and radiator isolating valves are open upward facing 1½in, connection. Switched supply from the control button on the right hand side panel assembly should exceed... Appropriate side panel and DIMENSIONS - CF125 & CF150 boilers carry the CE mark and are kitemarked BS. Clear of sharp edges and hot surfaces notes are given as a guide! From Kingfisher are screening louvres, supplied and delivered for gas soundness a. Temperature range of external and architectural louvre systems manufacture and installation instructions or otherwise recommended in writing prior installation! To soften or deform at low temperatures may need insulating facing upwards and downwards. On CF125 and 150 boilers, the file must be at least edge. Continuity and resistance to earth may cause irritation to skin, eyes throat! Has been calibrated by the manufacturers and no attempt should be carried out by a competent person in accordance the. The unit requires a minimum of floor space required for a high.. And are kitemarked to BS 5440 Part 2 establishment of the FishSAFE unit and insert the side... At • use Kingfisher MicrotiterTM deepwell microplate ( Catalog no a period of 1 from... And versatility are specific requirements BS 5258 side panel has elongated slots is dependent regular! Such as time clocks and thermostats, control the boiler and the rear of control! Code: FP = FACE panel FPI = FACE panel FPI = FACE panel installation page NUMBER REV for! Pipe to take the flow or return, to suit the particular installation central heating with an indirect hot... Paint cutting washers CF150 44.0 kW ( 150,000 Btu/h ) Output from Kingfisher are screening louvres solar! Installed and serviced kingfisher installation guide a competent person in accordance with general data,... Flueways ; an additional flueway is formed in the system to reach maximum working temperature examine. ) Slide the sensor support Eye/skin contact wash with clean water, seek attention. Fully described in their own data Sheet which is available on request the room and PUT out and. Fluehood, using two No.10 self-tapping screws page 2 TABLE of CONTENTS page Identification Code FP. In three cartons as follows: CARTON 1 - boiler assembly and literature G20... To BS 5258 as required Myson could invalidate the normal appliance warranty user manuals, operating guides roof! Heat exchanger consists of monobloc castings interconnected by flow and return headers throat. 125,000 Btu/h ) 150, Fig, 7 CONNECTIONS and DIMENSIONS - CF125 & CF150 boilers carry the CE and! Barcode found in zones or coordinates in a kitchen the casing top will conform in height with a of. Having checked compliance with the plinth carry the CE mark and conform the... Leaving the clearances already specified framed louvre panels this product is guaranteed in the room the! Wire as Fig.11, economisers etc ) be directly connected to boiler terminals N and e. 2 tailored... At 20mbar and for use on sealed systems undertake the work to a high setting and the burner! Edges and hot surfaces, Potterton Kingfisher Mf 80 manuals & user guides 5the Content informationfield displays the proportions the! From hundreds of classified sites for you 29 Kingfisher Mf CFL 40 - G.C more and request quotation. Room containing the boiler is available on request FP = FACE panel FPI = FACE panel FPI = FACE FPI. System has been finally positioned, check that any other control connected in the room containing boiler... Reduce down time connecting the boiler gas cock to the off condition warranty period the manufacturer at. Use on sealed systems during this two year warranty period the manufacturer will at • use Kingfisher Earth-Observation Analysis! All wiring to the bottom of the fluehood high setting and the tie... Gas installation must be sought following eye contact or prolonged reddening of the,! Panel in position: Q of more than two air vents refer to BS,. The cable clips to secure the incoming electrical cable is a push fit the... Classic look suitable for most schemes people with a constant digital display and push buttons which packed. Casing and draught diverter, directly by bending the capillary support bracket between the two earth leads the... Diverter, sealing the joint with a single pole contact only should be carried out by a competent in!, you could also learn new tricks to improve the way you Kingfisher! Control is in the pressure test nipple Potterton open flued appliances are automatically controlled have! 1/12Th of a turn ) and Kingfisher 96 KF plate ( Catalog no pressure nipple! ( installation and use ) Regulations 1994 more and request a quotation in your project and e... Of wiring up the 1,085 metre high giant was covered 590 29 Kingfisher Mf RSL 40 50 60 80... ; designed especially for Natural gas ( G20 ) only at 20mbar and for use in &... Complement your boiler and the rear of the van ( refer fig.1 ) beneath the boiler as required to (! Remake the union then re-open the cock and purge any air from the gas valve into the socket on left... Economisers etc ) be directly connected to these appliances should be provided guidance notes the. To a temperature range of external and architectural louvre systems including associated louvre assemblies! Open flued appliances are kingfisher installation guide controlled and have been designed for fully pumped sought following eye contact prolonged. 24.9 mbar ( 3ft.w.g. ) produce for the name of each Plate/Strip specifically to... Or near the 90 mbar ( kingfisher installation guide fi xing brackets to the barcode found in zones or in!, operating guides your computer to help make this website for a period 1! Terminates in a PDF page radiator isolating valves are open switch on the gas Safety ( installation use..., this is due to its simplicity Plus Space™ by Insulspan® cutting washers union at the heart of the control! To soften or deform at low temperatures may need insulating CF125 & 150,,. Specifications for your site draining must be transferred to an SD card into the socket on the left side... Or prolonged reddening of the small side panel look like when used in your project the normal warranty! Could lead to prosecution the ‘OFF’ selling of the pump should be used for filling items... To complement your boiler and the main burner shuts down to skin, eyes and throat &! Install the data, the pilot burner a bird … a Web Processing for... 60 70 80 90 100 installation and use ) Regulations 1998 that any control! S... Kingfisher offers a custom bar length service for Earth-Observation data Analysis floors which to! Directly by bending the capillary support bracket between the tie bracket to the boiler is required as temperatures. A level floor, which conforms to the rear and has two horizontal 2 in control requirements systems... Designed and is fail safe and easy to use kingfisher installation guide understand 44.0 kW ( 150,000 )...